Your Favourites

Save interesting products in this list and find them quickly at any time.

Simply click on the watch list symbol

Connecting the power supply to the whirlpool tub.

IMPORTANT: Installation must be carried out by a qualified electrician in accordance with national and local electrical installation regulations.

Step 1: Select one of the three available inlets for the cable duct. (yellow sticker)

Step 2: Determine the diameter of the cable duct and then drill a suitably dimensioned hole for it (if it is a ¾ inch cable duct, drill a 1-1/8 inch hole, if it is a 1 inch cable duct, drill a 1-3/8 inch hole). The + indicates where the centre of the hole should be. The hole saw must be able to saw through two plastic layers, between which there a 1 inch gap.

Step 3: Press the cable duct through the hole until it reaches the equipment compartment.

Step 4: Remove the cover from the control system box.

Step 5: Connect the cable duct to the control system box by means of a liquid-tight plug connection.

Step 6: Guide the required cables through the cable duct to the control system box.

Step 7: Connect the power supply cables to the terminal block in the control system box.

Step 8: Refit the cover on the control system box and the equipment compartment door. The electrical connection has now been completed.